logo
Navigation Menu
Menu
Home > News > Stone crusher precautions

Contact Us

Stone crusher precautions

(Rating: 5.00 / 5 - total 1 votes)
Loading...
Date: 2019-11-01


Stone crusher precautions

  1. Before the stone crusher runs, check whether the bearings are lubricated and connected well; whether there are any debris in the crushing chamber; all the fittings are tightly fastened.
  2. The stone crusher should start at no load. After normal operation, start feeding. It is necessary to pay attention to the uniform addition of the material into the crushing chamber. Do not add material on one side or excessively accumulate material, which will result in a single Excessive force on the side or excessive strength of the equipment may result in damage to the equipment.
  3. Under normal conditions, the temperature rise of the bearing should not exceed 35 °C, and the maximum temperature rise does not exceed 70 °C. Once an abnormality is found, it should be stopped in time for a comprehensive inspection, and then the equipment should be operated after returning to normal.
  4. When the stone crusher stops, the feed should be stopped first and then the power should be cut off. The order must not be reversed.
    5, often repair the various parts of the machine, pay attention to lubrication and replace the parts with serious wear, to avoid the equipment can not operate properly.
OLYMPUS DIGITAL CAMERA


©2024 Shanghai Joyal Machinery Co., Ltd. All rights reserved.              E-Mail:joyal@crusherinc.com